BD3 Status Update: April 2017

The Carbon Capture and Storage facility at Boundary Dam Power Station was online for 97% of the month of April, going offline for less than a day to address ash buildup in the power plant’s boiler. The facility captured 56,809 tonnes of carbon dioxide, contributing to the 1,530,368 tonnes captured since inception. In mid-April, SaskPower […]

BD3 Update Image
BD3 Update Image

BD3 Status Update: March 2017

In March, the CCS facility at Boundary Dam Power Station was online 100 per cent of the time and captured 56,421 tonnes of carbon dioxide. Since inception, this facility has captured almost 1.5 million tonnes of carbon dioxide. This is equivalent to the gas emissions of over 350,000 vehicles or over 300,000 Canadian coast to […]

BD3 Status Update: February 2017

Due to a planned outage at the Boundary Dam Power Station CCS facility, the facility experienced lower than average performance during the month of February. In February, the facility captured over 21,800 tonnes of carbon dioxide while operating at 39 per cent of the month. As noted in January’s BD3 update, planned maintenance for routine […]

BD3 Update Image
BD3 Update Image

BD3 Status Update: January 2017

The CCS facility at Boundary Dam Power Station performed well in January, successfully capturing just over 63,000 tonnes of carbon dioxide. Since start-up, the CCS facility has captured and prevented over 1.3 million tonnes of carbon dioxide from going into the atmosphere. The facility was in operation 88 per cent of the month, and went […]

BD3 Status Update: December 2016

In December, the carbon capture process at Boundary Dam Power Station captured 58,569 tonnes of carbon dioxide. This completes the year with 792,533 tonnes captured in 2016 and 1,332,200 million tonnes captured and prevented from entering the atmosphere since operations began in October 2014. That’s the equivalent greenhouse gas emissions from more than 330,000 vehicles. […]

BD3-Update-Promoted
BD3 Update Image

BD3 Status Update: November 2016

In November, the CCS process at Boundary Dam Power Station underwent maintenance for six days.  In mid-November, we also experienced a compressor electrical failure in the power unit, which took it offline for several days. These two items had an overall impact on our monthly capture totals. Through the process, we were able to capture […]

BD3 Status Update: October 2016

In October, the process operated very reliably once again, capturing 82,355 tonnes of carbon dioxide during 100% of the hours in the month. This brings the total capture for 2016 to 686,700 tonnes, on track to capture 800,000 in 2016. The end of October also marked an important milestone, with the process having captured 800,000 […]

BD3 Update Image
BD3-Update-Promoted

BD3 Status Update: September 2016

In September, the process operated very reliably (100 per cent of the hours in the month), capturing 77,111 tonnes of carbon dioxide for sale or permanent storage. This means it continues to be on track to capture a total of 800,000 tonnes in 2016. Since it began operations in Oct. 2014, the process has captured […]

BD3 Status Update: August 2016

The CCS process at Boundary Dam Power Station underwent maintenance in August. Early in the month, a minor electrical failure at the power unit kept the unit off line, which meant no flue gas was available to the carbon capture facility for several days. This is not unusual for power units, but it did impact […]

BD3 Update Image
BD3-Update-Promoted

BD3 Status Update: July 2016

The CCS facility at Boundary Dam Power Station performed well in July. It successfully captured 76,546 tonnes of carbon dioxide, while operating nearly 100 per cent of the hours in the month, slowing down for 15 minutes near the end of the month. This means the carbon capture unit has surpassed the capture of a […]

BD3 Update Image

BD3 Status Update: June 2016

The CCS facility at Boundary Dam Power Station performed relatively well in June. It successfully captured 62,361 tonnes of carbon dioxide. The facility needed to be taken down on separate occasions due to issues with the chemistry of the capture process. The chemical compound used at the core of the CCS process (amine) is affected […]

BD3-Update-Promoted

BD3 Status Update: May 2016

The CCS facility at Boundary Dam Power Station was taken down for scheduled maintenance in May after several months of continuous operation. The ten-day outage was used to inspect and clean various parts of the unit before bringing it back online. The facility captured 50,102 tonnes of carbon dioxide in May. This brings the 2016 […]

BD3 Update Image

BD3 Status Update: April 2016

The CCS facility at Boundary Dam Power Station continued to perform at a high level in April.  Unit 3 captured 82,033 tonnes of carbon dioxide, and was online 100 per cent of the time in April.  This brings the total of CO2 captured in 2016 to just under 300,000 tonnes, or 75 per cent of […]

BD3 Update Image

BD3 Status Update: March 2016

The carbon capture process performed as expected in March. It was operational for 100% of the hours in the month, exceeding our 85% reliability target, and it was operational 82 of the first 91 days of the year, primarily due to planned maintenance, for a 90% reliability factor in the first quarter of 2016. A […]

BD3 Update Image

BD3 Status Update: February 2016

The carbon capture process was taken down in February to inspect many components and confirm that the equipment has been functioning properly. This was also an opportunity to clean the process equipment. The inspection was positive, and only revealed some minor items that were repaired. The carbon capture facility was down for seven days. Productivity […]

BD3-Update-Promoted

BD3 Status Update: January 2016

Last month, the CCS process operated as expected. In some months, routine maintenance and inspection is planned, and in other months such as January, the facility can be operated 100% of the time. Over a year, we expect the facility to be up and running approximately 85% of the time. Our 100% online achievement for […]

BD3-Update-Promoted

BD3 Status Update: December 2015

The carbon capture process continued to operate well in December. We brought the system offline to address a minor mechanical issue on the power plant side of the process. We took advantage of this down time to also execute a planned chemical cleaning of the carbon capture facility that we brought forward from January. The six-day cleaning (from Dec. 12-17) was completed […]

BD3-Update-Promoted

BD3 Status Update: November 2015

We’ve completed our scheduled maintenance on the process. This was an opportunity to replace certain parts that had technical or mechanical issues. This maintenance involved five main components: The regularly scheduled four-week outage for unit three (that every other power unit also undergoes); The replacement of the large containment vessel that holds the main chemical […]

Pran Cheruvallath

The Faces of CCS: 5 Questions with Pran Cheruvallath

Carbon capture and storage (CCS) is one of many innovative career paths at SaskPower. As we prepare to mark the one-year anniversary of SaskPower’s Boundary Dam Unit 3 CCS project (BD3), we had a chance to sit down with some of the men and women that made it a reality – like Pran Cheruvallath, Senior […]

Helene Careau

The Faces of CCS: 5 Questions with Helene Careau

Carbon capture and storage (CCS) is one of many innovative career paths at SaskPower. As we prepare to mark the one-year anniversary of SaskPower’s Boundary Dam Unit 3 CCS project (BD3), we had a chance to sit down with some of the men and women that made it a reality – like Helene Careau, Resource […]

Gregg Milbrandt

The Faces of CCS: 5 Questions with Gregg Milbrandt

Carbon capture and storage (CCS) is one of many innovative career paths at SaskPower. As we prepare to mark the one-year anniversary of Carbon Capture and Storage at SaskPower, we had a chance to sit down with some of the men and women that made it a reality – like Gregg Milbrandt, Manager – Power […]

Debbie Kajati

The Faces of CCS: 5 Questions with Debbie Kajati

Carbon capture and storage (CCS) is one of many innovative career paths at SaskPower. As we prepare to mark the one-year anniversary of SaskPower’s Boundary Dam Unit 3 CCS project (BD3), we had a chance to sit down with some of the men and women that made it a reality – like Debbie Kajati, Manager, […]

Daniel Knisley

The Faces of CCS: 5 Questions with Daniel Knisley

Carbon capture and storage (CCS) is one of many innovative career paths at SaskPower. As we prepare to mark the one-year anniversary of SaskPower’s Boundary Dam Unit 3 CCS project (BD3), we had a chance to sit down with some of the men and women that made it a reality – like Daniel Knisley, Senior […]

Erin-Promoted

Spreading the CCS Message

Next week, our Boundary Dam Power Station—home to the world’s first Carbon Capture and Storage (CCS) Facility of its kind— will open its doors to grade seven students as part of World Environment Day. On June 5, the 44 students from Estevan’s Hillcrest and Westview schools will start their day by participating in various experiments. […]

LATEST STORIES ON THE BLOG

Go to Blog Home Page >

UPCOMING EVENTS

There are no upcoming events

TWITTER

FACEBOOK

Express Yourself

This page makes me feel...

%

CURIOUS

%

UNSURE

%

FRUSTRATED

%

INFORMED

%

INSPIRED

%

BORED