Issued for Saskatchewan
2012
- Bulletin 04-2012 – Gas Fireplace and Gas Heater Installations
- Bulletin 03-2012 – Gas Installations in Landslide Areas
- Bulletin 02-2012 – General Bulletin
- Bulletin 01-2012 – Sidewall Venting and Temporary Heat
2011
- Bulletin 04-2011 – NSF Certification of Polyethylene Piping
- Bulletin 03-2011 – General Oil Field Bulletin
- Bulletin 02-2011 – Masonry Chimneys and Gas Leaks
- Bulletin 01-2011 – Regina Inspections Office Relocating
2010
- Bulletin 03-2010 – Flooding Requirements and Emergency Procedure Guidelines
- Bulletin 02-2010 – 2010 Gas Code Meetings
- Bulletin 01-2010 – Successful Prosecution of a Saskatchewan Gas Contractor
2009
- Bulletin 04-2009 – Propane Tank Installation and Fuel Supply
- Bulletin 03-2009 – 2010 Codes
- Bulletin 02-2009 – Gas Detectors/Ventilation for Stationary Engines
- Bulletin 01-2009 – General Bulletin
2008
- Bulletin 05-2008 – Canadian Hydrogen Installation Code
- Bulletin 04-2008 – Red Tag Program and Guidelines
- Bulletin 03-2008 – Non-Certified Plastic Special Components
- Bulletin 02-2008 – General Bulletin
- Bulletin 01-2008 – Plastic Venting Clarification
2007
- Bulletin 05-2007 – Gas-Fired Equipment Located on Oil and Gas Sites Within Saskatchewan
- Bulletin 04-2007 – Clarified Fee Schedule
- Bulletin 03-2007 – Sidewall Vented Water Heaters
- Bulletin 02-2007 – 2007 Gas Code Meetings
- Bulletin 01-2007 – Gas Permits and Related Fees
2006
- Bulletin 03-2006 – Successful Prosecution of an Unlicensed Saskatchewan Gas Contractor
- Bulletin 02-2006 – Plastic Venting Audits — 2007 Code Supplement
- Bulletin 01-2006 – Permits and Field Approvals for Gas-Fired Equipment Utilized in Oil and Gas Production—Oil and Gas Field Permit Appendix
2005
- Bulletin 03-2005 – Successful Prosecution of an Unlicensed Saskatchewan Gas Contractor
- Bulletin 02-2005 – Plastic Venting Audits — 2007 Code Supplement
- Bulletin 01-2005 – Add-on Furnace Control Device/Venting Heat Recovery Devices
Have questions? Contact Permits and Inspections.
