SaskPower Supplied Transformation - Standard

Print this page Make font smaller Reset font size Make font larger

Customer Service

What are these rates for?

To metered non-residential and non-farm loads greater than 75 kilovolt amperes (kVA) served through SaskPower-supplied transformation and to which no other rates apply.

Up to 75 kVA—For loads up to and including 75 kVA refer to Small Commercial - Urban and Rural Rates

Recorded demand

  • The maximum kVA demand registered during the current month, or
  • For services with approved time-of-day metering, the greater of the maximum kVA demand registered between the hours of 07:00 to 22:00 Monday through Friday, excluding statutory holidays or 70 per cent of the maximum kVA demand registered at any other time during the current month.

Effective August 1, 2010

Rate Code Urban
E05
Rural
E06
Basic monthly charge $38.85 $55.00

Demand Charge

- First 50 kVA/mo. 0 0
- Balance $/kVA $11.30 $12.25

Energy Charge

First block kWh/mo. 16,750 kWh 15,500 kWh
- First block (¢/kWh) 8.990¢ 9.185¢
- Balance (¢/kWh) 5.947¢ 5.602¢

Minimum bill—The basic monthly charge plus $3.73/kVA of the maximum recorded demand over 50 kVA registered over the past 11 months.