Athabasca System Hydroelectric Stations
located near Uranium City
includes the Waterloo, Wellington and Charlot River hydro stations
the three stations have a combined generating capacity of 23 net MW
the stations were acquired by SaskPower in 1986
Wellington
Power Station
two units with a combined generating capacity of 4.8 net MW
2.4 net MW unit commissioned in 1939
2.4 net MW unit commissioned in 1959
Waterloo Power Station
downstream from Wellington
one unit with a generating capacity of 8 net MW
commissioned in 1961
Charlot
River Power Station
downstream from Waterloo
two units with a combined generating capacity of 10 net MW
two 5 MW units commissioned in 1980