E.B.
Campbell Hydroelectric Station
located on the Saskatchewan River near Nipawin
eight units with a combined generating capacity of 288 net MW
six 34 net MW units were commissioned in 1963/1964
two 42 net MW units were commissioned in 1966
the station is named in honour of E.B. (Bruce) Campbell, a former SaskPower
president, who was the assistant chief engineer during the construction
of this station