Recent additions and revisions have been incorporated
into SaskPower’s Electric Service Requirements. These changes are
now in effect, and supercede any previous requirements.
Listed below are the significant changes. Please refer to the applicable
section for further details of the change.
 |
| 2.1.3 Point of Delivery |
|
- Added requirement for fused disconnect
after 400 A self-contained meter socket |
 |
| |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| |
|
- Clarification of connection of consumer supplied
cables to SaskPower’s pad-mounted transformer |
 |
| 2.1.4.1 Buried Service Requirements - Single Family
Detached Dwelling |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| 2.1.4.3 Buried Service Requirements - Apartment Buildings
/ Condominiums |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| 2.1.6.2.1 Metering - Meter Mounting Devices - General |
|
- Clarified the requirement for current bypass switch
for services greater than 200 A that do not use the 400 A self-contained
meter socket |
 |
| 2.1.6.2.5 Metering - Meter Mounting Devices - Specifications |
|
- Changed the requirement of the allowable size of
the subdivisions from calculated load to the total ampere rating
of the two consumer service disconnects. Applies to 200 A and 400
A dual lug meter sockets. |
 |
| 2.1.6.3 Metering - Electrical Room |
|
- Added requirement for accessibility from the exterior
of the building or from a common hallway |
 |
| |
|
- Added requirement for accessibility via stairs,
and not via a ladder. |
 |
| 2.1.6.4.1 Metering - Instrument Transformers &
Enclosures - General |
|
- Added requirement for consumer to supply and install
the instrument transformer enclosure and meter socket for service
voltages at 4160 V. |
 |
| 2.1.6.4.3 Metering - Instrument Transformers &
Enclosures - Instrument Transformer Enclosures |
|
- Added option for locating instrument transformer
enclosures outdoors. |
 |
| 2.2.3 Point of Delivery |
|
- Added requirement for fused disconnect after 400
A self-contained meter socket |
 |
| |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| |
|
- Clarification of connection of consumer supplied
cables to SaskPower’s pad-mounted transformer |
 |
| 2.2.4.1.1 Buried Service Requirements - Standard
Service - Single Phase Service up to 300 V (greater than 200 A)
|
|
- Added service termination / CT enclosure |
 |
| |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.1.2 Buried Service Requirements - Standard
Service - Single Phase Service Greater than 300 V (up to 200 A)
|
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.1.3 Buried Service Requirements - Standard
Service - Polyphase Service up to 300 V (up to 200 A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.1.3 Buried Service Requirements - Standard
Service - Polyphase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.2.4.1.4 Buried Service Requirements - Standard
Service - Polyphase Service Greater than 300 V (up to 200 A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.2.1 Buried Service Requirements – Farm
Irrigation - Single Phase Service up to 300 V (up to 200 A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.2.1 Buried Service Requirements – Farm
Irrigation - Single Phase Service up to 300 V (greater than 200
A) |
|
- Added service termination / CT enclosure |
 |
| |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.2.2 Buried Service Requirements – Farm
Irrigation - Single Phase Service Greater than 300 V (up to 200
A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.2.3 Buried Service Requirements – Farm
Irrigation - Polyphase Service up to 300 V (up to 200 A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.4.2.3 Buried Service Requirements – Farm
Irrigation - Polyphase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.2.4.2.4 Buried Service Requirements – Farm
Irrigation - Polyphase Service Greater than 300 V (up to 200 A) |
|
- Added secondary terminals of SaskPower supplied
pad-mounted transformer as a service option |
 |
| 2.2.5.2.1 Metering - Meter Mounting Devices - General |
|
- Clarified the requirement for current bypass switch
for services greater than 200 A that do not use the 400 A self-contained
meter socket |
 |
| 2.2.5.2.5 Metering - Meter Mounting Devices - Specifications |
|
- Changed the requirement of the allowable size of
the subdivisions from calculated load to the total ampere rating
of the two consumer service disconnects. Applies to 200 A and 400
A dual lug meter sockets. |
 |
| 2.2.5.3.1 Metering - Instrument Transformers &
Enclosures - General |
|
- Added requirement for consumer to supply and install
the instrument transformer enclosure and meter socket for service
voltages at 4160 V. |
 |
| 2.2.5.3.3 Metering - Instrument Transformers &
Enclosures - Instrument transformer Enclosures |
|
- Added option for locating instrument transformer
enclosures outdoors. |
 |
| 2.3.3 Point of Delivery |
|
- Added requirement for fused disconnect after 400
A self-contained meter socket |
 |
| |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| |
|
- Clarification of connection of consumer supplied
cables to SaskPower’s pad-mounted transformer |
 |
| 2.3.4.1.1 Buried Service Requirements - Standard
Service - Single Phase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.4.1.3 Buried Service Requirements - Standard
Service - Polyphase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.4.2.1 Buried Service Requirements - Strip Malls
- Single Phase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.4.2.3 Buried Service Requirements - Strip Malls
- Polyphase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.4.3.1 Buried Service Requirements - Commercial
Rental Unit - Single Phase Service up to 300 V (greater than 200
A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.4.3.3 Buried Service Requirements - Commercial
Rental Unit - Polyphase Service up to 300 V (greater than 200 A) |
|
- Added service termination / CT enclosure |
 |
| 2.3.6.1 Metering – General |
|
- Added irrigation valves to services not requiring
metering. |
 |
| 2.3.6.2.1 Metering - Meter Mounting Devices - General
|
|
- Clarified the requirement for current bypass switch
for services greater than 200 A that do not use the 400 A self-contained
meter socket |
 |
| 2.3.6.2.2 Metering - Meter Mounting Devices - Self-Contained
Meter Sockets |
|
- Meter sockets to be allowed indoors when security
or safety is an issue. |
 |
| 2.3.6.2.4 Metering - Meter Mounting Devices - Transformer-Rated
Meter Sockets |
|
- Meter sockets to be allowed indoors when security
or safety is an issue. |
 |
| 2.3.6.2.5 Metering - Meter Mounting Devices - Specifications |
|
- Changed the requirement of the allowable size of
the subdivisions from calculated load to the total ampere rating
of the two consumer service disconnects. Applies to 200 A and 400
A dual lug meter sockets. |
 |
| 2.3.6.3 Metering - Electrical Room |
|
- Added requirement for accessibility from the exterior
of the building or from a common hallway |
 |
| |
|
- Added requirement for accessibility via stairs,
and not via a ladder. |
 |
| 2.3.6.4.1 Metering - Instrument Transformers &
Enclosures - General |
|
- Added requirement for consumer to supply and install
the instrument transformer enclosure and meter socket for service
voltages at 4160 V. |
 |
| 2.3.6.4.3 Metering - Instrument Transformers &
Enclosures - Instrument Transformer Enclosures |
|
- Added option for locating instrument transformer
enclosures outdoors. |
 |
| 2.4.3 Point of Delivery |
|
- Added service termination / CT enclosure (single
and polyphase) |
 |
| |
|
- Clarification of connection of consumer supplied
cables to SaskPower’s pad-mounted transformer |
 |
| 2.4.5.2.4 Metering - Meter Mounting Devices - Specifications |
|
- Changed the requirement of the allowable size of
the subdivisions from calculated load to the total ampere rating
of the two consumer service disconnects. |
 |
| 2.4.5.3 Metering - Electrical Room |
|
- Added requirement for accessibility via stairs,
and not via a ladder. |
 |
| 2.4.5.4.1 Metering - Instrument Transformers &
Enclosures - General |
|
- Added requirement for consumer to supply and install
the instrument transformer enclosure and meter socket for service
voltages at 4160 V. |
 |
| 2.4.5.4.3 Metering - Instrument Transformers &
Enclosures - Instrument Transformer Enclosures |
|
- Added option for locating instrument transformer
enclosures outdoors. |
 |
| Figure 2-1 |
|
- wood backing behind meter socket and conduit to
extend 300 mm above finished grade |
 |
| |
|
- bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-2 |
|
- wood backing behind meter socket and conduit to
extend 300 mm above finished grade |
 |
| |
|
- bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-4 |
|
- wood backing behind meter socket and conduit to
extend 300 mm above finished grade |
 |
| |
|
- bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-4a |
|
- New figure for single phase service termination/CT
enclosure |
 |
| Figure 2-4b |
|
- New figure for polyphase service termination/CT
enclosure |
 |
| Figure 2-5 |
|
- Bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-6 |
|
- Changed maximum number of meter sockets per multi-position
meter trough to be determined by Code. |
 |
| |
|
- Bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-7 |
|
- Changed orientation of block assembly |
 |
| |
|
- Bottom of PVC sleeve shown even with bottom of
supply conduit |
 |
| Figure 2-8 |
|
- Clarified that combination meter socket includes
meter and test switch. |
 |
| Figure 2-13 |
|
- Updated to match SaskPower’s Construction
Standards Manual |
 |
| Figure 2-17 |
|
- Updated to match SaskPower’s Construction
Standards Manual |
 |
| Figure 2-20 |
|
- Updated to match SaskPower’s Construction
Standards Manual |
 |
| |
|
- Added dimension for minimum 900 mm between service
attachment point and roof |
 |
| |
|
- Finished grade or surface now includes decks. |
 |
| Figure 2-27 |
|
- Changed minimum class for metering pole to class
4/35’ |
 |
| |
|
- Added clarification that SaskPower will supply and install ground
grid for metering pole |
 |
| Table 2-1 |
|
- Added service termination/CT enclosure and associated
service conductors and conduits |
 |
| |
|
- Added 20” X 20” X 8” polyphase
splitter and associated service conductors and conduits |
 |
| Table 2-3 |
|
- Updated to match SaskPower’s Construction
Standards Manual |
 |
| Table 2-5 |
|
- Updated to match SaskPower’s Construction
Standards Manual |
No changes.