Nipawin Hydroelectric Station

 

Commissioned: 1985
Location: Nipawin, SK
Fuel source: Hydro
Net capacity: 255 MW

  • More facts

    • Located on the Saskatchewan River near Nipawin.
    • Three units in total with a combined generating capacity of 255 MW.
    • The first unit (with a generating capacity of 85 MW) was commissioned in 1985.
    • The final two units (with a combined generating capacity of 170 MW) were commissioned in 1986.

Hydroelectric Stations

Hydroelectricity is created by falling water. 138 Water from reservoirs flows through the penstocks that connect the reservoir to the station. The water turns a hydraulic turbine, which rotates a generator and produces electricity

  • Learn more

    Once the water has been through the turbine, it is directed into the exit, called a tailrace. The water is then returned to the river below the dam where it continues downstream toward its natural destination.

    By holding water in the reservoir, the potential for immediate electricity is stored. Excess water from heavy rains or spring run-off can be released from the reservoir through spillway gates, if required.

Express Yourself

This page makes me feel...

%

CURIOUS

%

UNSURE

%

FRUSTRATED

%

INFORMED

%

INSPIRED

%

BORED